Production Planning
The Production Planning view lets you schedule constructibles (assemblies and modules) on a calendar, manage production priorities, and visualize workload across your production lines.
Calendar View
The calendar displays 1 to 4 months at a time, with each day showing the constructibles scheduled for production on that date. Items are ordered by priority within each day.
Visual Indicators
- Green — Selected constructible.
- Orange — Modified (unsaved changes).
- Red — Overdue (past scheduled date, not yet produced).
- Grey — Past dates.
- Blue — Normal scheduled item.
Scheduling Constructibles
Drag and Drop
Drag a constructible from one date to another to reschedule it. You can also drag items from the Unscheduled Constructibles panel into the calendar.
Priority
Within a single day, constructibles are produced in priority order (1 = first). Use the up/down arrows to reorder items within a date.
Multi-Select
- Ctrl+Click — Select multiple individual items.
- Shift+Click — Select a range of items.
This allows you to move or modify several constructibles at once.
Filters
- Production line — Show only constructibles assigned to a specific line.
- Projects — Filter by one or more projects.
Settings
Click the settings icon to configure the calendar display:
| Setting | Description |
|---|---|
| Displayed months | Show 1 to 4 months at a time. |
| Calendar height | Adjust the row height. |
| Shown weekdays | Choose which days of the week to display. |
| Visible fields | Select which data to show on each card (design name, UUID, client order, project, super-project, status). |
| Workload display | Toggle workload heatmap on calendar dates. |
| Show ready items | Show or hide already-completed constructibles. |
Workload
When enabled, each calendar date shows a workload indicator based on the total expected production time for that day compared to the production line's capacity.
The workload is calculated from:
- Design area (m²) of each scheduled constructible
- Expected work time per m² at each station
- Production line's configured daily capacity (minutes per day)
TIP
You can override the daily work capacity in the planning settings to model different scenarios (e.g., overtime, reduced shifts).
Saving Changes
After making scheduling changes, click Save to persist the updated dates and priorities. Unsaved changes are highlighted in orange.